The Transmission Company of Nigeria (TCN) has declared force majeure on the 330kV Kainji-Birnin Kebbi transmission line following the collapse of a transmission tower along the corridor.
In a statement on Tuesday, TCN said the line tripped at 10.44 pm on September 7, while a trial reclosure attempt at 11.07 pm also failed.
